SPC Flooring
From benchmark product
to a commercial collection.
Develop the decor, construction and finish your range needs. We compare Vietnamese factories, coordinate samples and follow the agreed product through production.
Discuss an SPC programmeFactory Fit
The product comes first.
Then the factory.
A factory can be capable and still be wrong for the programme. We compare the requirements that change fit before samples and tooling lock the decision.
Read the factory-fit exampleProduction scale, repeatability and appetite for development work.
The real minimum by decor, format, profile and run.
Film, surface, locking and specialist processes.
Who owns technical answers, how changes are recorded and how reliably the factory responds.
Build the Collection
Look, format and construction.
01
Look & feel
Colour matching, ultra-matt, EIR, pressed bevel, CeraGrout and digital print.
02
Format & installation
Plank, XL, tile, large tile and traditional or single-panel herringbone.
03
Construction
Rigid SPC, acoustic backing, ABA / hybrid and selected PVC-free PET routes.
Colour & Decor Matching
Send the reference.
Approve the finished floor.
Provide a board, existing floor, artwork or timber scan. Euro Vietnam works directly with decorative-film producers and the flooring factory to match the visual and produce it as a finished plank.
See how colour matching works- 01
Provide the reference
A physical board, an existing floor, digital artwork or a timber scan.
- 02
First finished flooring sample
Typically 7–14 days to a first colour-matched finished flooring sample, depending on the reference and production method.
- 03
Review and approve the master sample
Colour, gloss and surface are judged together. The approved sample becomes the visual reference for production.
Approved Sample to Shipment
A good sample still has to survive production.
The approved decor, surface, construction and packing become the working standard.
Lock the product
One current specification, one approved sample and explicit approval for later changes.
Prepare it for market
Cartons, labels, barcodes, instructions and pallet basis.
Check production
Product-specific checks for construction, visual result, locking performance and packing.
Starting Point
Send the benchmark. We will define what comes next.
A sample, board, current range or product idea is enough to begin. We will identify the open product decisions, the factories worth considering and the first sample to make.