---
title: "How to Approve Your SPC Flooring Reorder"
url: "https://euro-vietnam.com/journal/what-the-decor-code-misses-on-an-spc-reorder/"
---

# How to Approve Your SPC Flooring Reorder

Use your original batch to check shade, backing and click fit before releasing an SPC reorder, especially when the new boards will extend an existing floor.

When I approve an SPC flooring reorder, I ask where the new boards will go. Replenishment for new jobs can be handled as a separately identified lot. A few cartons to finish an existing room or replace damaged planks need a closer look. In that case someone has to join new boards to an older floor. Put that use on the purchase order before the factory confirms the run.

## Start with a board from the first order

Find the carton label and the original order or product code. The best reference for an extension is a finished board from the batch that went in. An unused spare from the job can give you that reference and the installer can show you what the floor looks like today. If you only have the original sales sample, tell the factory where it came from and agree what you will use to judge the reorder.

Ask the factory to put both specifications on one page. Focus on details you can verify on a finished plank or trace back to the production run.

- **Face and finish.** Record the décor reference, wear layer thickness and type, surface finish, embossing and bevel. Include the signed sample or shade range the factory should match.
- **Construction and fit.** Record the finished dimensions, core and click profile revision. If the plank has attached backing, include its material, grade and thickness.
- **Production reference.** Identify the plant and original finished lot where you can. Ask the factory to list the proposed changes against the original specification and say how each change will be checked.

Give those details to the inspector with the finished reference board. This is a good point to find out that a sampling room made your reference and a different line will run the order. Ask which finished boards you will see before the factory packs the lot. [From a reference board to a colour-matched sample](https://euro-vietnam.com/journal/from-a-reference-board-to-a-colour-matched-flooring-sample-in-vietnam/)

## Compare a section of floor across several cartons

Take boards from several production cartons in each lot you are considering and keep the carton references with the samples. Lay them out in the same direction beside your retained board. With a varied oak print, look across the whole group. A darker grain feature on one board is part of what you may have approved. A colour or sheen shift that runs across the whole group is a different finding. Record the light you used and check again under the lighting where the new boards will meet the old floor. [X-Rite’s guide to visual colour evaluation](https://www.xrite.com/blog/the-science-behind-visual-evaluation)

If the new lot sits outside the agreed range, ask which rolls of décor film and wear layer went into the affected cartons. Check the topcoat, gloss and embossing against the approved reference too. Ask the factory to bring back finished boards after any correction and tie them to the cartons you are being asked to accept.

## Bring old and new planks to the same join

Use actual boards from both runs. On a flat surface that meets the product instructions, have the installer or factory technician dry-fit both long edges and end joints. Look for a closed seam, a height difference and any rocking. Photograph the joint with the old and new boards identified. A trial like this records the initial fit and gives the manufacturer a specific assembly to assess. [What edge-strength testing tells you about an SPC click profile](https://euro-vietnam.com/journal/spc-flooring-edge-strength/)

If the factory proposes a different IXPE backing, ask for comparable data for the two foams at the specified thickness. Check how much each compresses under a given load and what thickness it recovers after the load is removed. Ask how long the load was applied and when recovery was measured so you can compare the reports. For areas with repeated wheel traffic, ask whether the evidence covers repeated loading of the mixed joint. Get the flooring manufacturer’s written confirmation that the two finished plank builds can be joined under the intended traffic and site conditions. [ASTM test methods for flexible closed-cell olefin foam](https://store.astm.org/d3575-20.html)

## Tell the warehouse and installer which lot to use

When the manufacturer approves a continuous installation and you accept the shade and fit, carry that decision onto the release note. Give the warehouse and installer the lot numbers and the area they cover. Reserve any spare cartons from the accepted lot for later repairs.

If the new boards are approved for a separate area, tell the warehouse to keep that lot together. Confirm the layout and transition detail with the installer under the product instructions. If the original area still needs planks and compatibility is open, keep that part of the order on hold until the factory can show you a suitable match.

For an approved extension, put the instruction in writing with the shipment.

> Release batch [new lot] for [project]. It may be joined to [original lot] in [area] under [installation guide and revision]. Hold any cartons with a different lot code for separate review.

Check the dispatched cartons against that note and keep the lot references on the packing list. Ask the installer to verify the labels and look at the delivered boards in the room before fitting. Karndean’s UK rigid-core instructions are one example of a manufacturer asking for design, colour and batch checks before installation. Your project should follow the instructions for the exact floor being supplied. [Karndean’s UK rigid-core installation instructions](https://www.karndean.com/globalassets/karndean/downloads/residential-and-commercial/pdfs/installation-guides/uk/karndean-designflooring-installation-guidelines-uk-rigid-core.pdf)

## Your next step

Send us the original batch reference, a photo of the carton label and where the new boards will go. We can use those details to discuss what your factory needs to confirm.

[Discuss your SPC flooring reorder](https://euro-vietnam.com/#inquiry)
